The raw material preparation line is designed for receiving, transporting, fractionating, drying and feeding biomass to subsequent process units, including the BIO-KILN-3 continuous carbonization furnace.
The main objective of the line is to provide raw materials with stable size, moisture content, and bulk properties to produce biochar/charcoal with stable quality and yield and predictable characteristics.
The line creates a controlled flow of raw materials, reduces the influence of the human factor, decreases heat loss and ensures continuous operation of the main thermal equipment.
Brief description
The GREENPOWER raw material preparation line is a complete equipment system for processing wood and plant biomass to the parameters required for stable carbonization. The system includes units for receiving and transporting raw materials, sorting, drying, removing large particles, and feeding the prepared material into the furnace. The line is designed to meet the required throughput, raw material type, initial moisture content, and final product requirements.